Aquila Eagle Mountain Power Generation Facility
Salt Lake City, Utah
The Williams Companies is supplying “behind-the-meter” power for Meta’s Eagle Mountain data center campus that is being expanded near Salt Lake City, Utah via a 286 MW natural gas power generation facility. The project required a “speed to market” approach utilizing modular trailer mounted natural gas turbines and generators along with helical pile utilization wherever practical.
QISG performed project management services and utilized Quanta sister companies, Flint, Flare, and Mears to provide construction installation services. Flint performed structural concrete and mechanical equipment installation, Flare performed civil grading and excavation, and Mears performed mechanical piping as well as electrical and instrumentation.

Client
Williams
Delivery Method
GC Contractor
Key Features or Awards
– Eleven (11) GE TM 2500 turbine generator packages (trailer mounted) and associated equipment, including Sisu SCRs
– Six (6) Solar Titan 250 turbine generator packages (skid mounted), and associated equipment, including Sisu SCRs
– Seventeen (17) GSU transformers
– Nine (9) 15 KV switchgear buildings
– Operations/control building
– Two (2) Caterpillar 3520 black-start generators
– 25,000 CY formed structural concrete
– 5,000 helical piles
– Ten (10) miles of ammonia and water piping
– 225 miles of electrical wire, conduit and cable for 34.5kV and smaller sizes
– Three (3) miles of cable tray
– Structural support structures installation
– Mechanical equipment and piping installation
– Electrical equipment and wiring installation
Participating Quanta Companies
– Flint
– Mears
– Flare
– QISG